Transrapid |
|||||||
![]() |
|||||||
The contract with China represented the breakthrough for Transrapid maglev technology. Around 30 km long, the Transrapid line was completed at the beginning of 2003 and connects the Pudong International Airport with the financial center of Shanghai. The Transrapid began commercial operation at the beginning of 2004 and travels the 30 kilometer stretch every 10 minutes, with an operating speed of 430 km/h, in a little more than seven minutes.
|
Our companies:
|
||||||
![]() |